HIGROWSIR TopSpread 3C LED toplight shown in a commercial glass greenhouse.

TopSpread 3C Commercial Greenhouse LED Toplight

TopSpread 3C Commercial Greenhouse LED Toplight Flexible Spectrum Control,
Without Unnecessary Complexity.

Three independently controlled light channels give growers practical spectrum flexibility without overcomplicating the lighting system.

Explore TopSpread 3C

TopSpread 3C
Overview

Built for the Way
Commercial Greenhouses Operate.

 

Concept diagram of independent red, blue and white spectrum channels for TopSpread 3C greenhouse lighting.

Flexible Beyond One Light Recipe

Independent red, blue and white channels adapt to different crops and production needs.

DIALux simulation showing greenhouse fixture layout and calculated light distribution for lighting project planning.

Plan Before Installation

Simulate fixture quantity, spacing and light distribution before installation.

Exterior of a multi-span commercial glass greenhouse with roof ventilation structures.

Built for Greenhouses

Designed around commercial greenhouse structures, layouts and control requirements.

TopSpread 3C at a Glance

800 -1200 W

POWER OPTIONS

     3 CH

INDEPENDENT CHANNELS

277–480 Vac

AC INPUT

IP65

PROTECTION

DIGITAL

DIMMING

WHEN 3 CHANNELS MAKE SENSE?

Choose 3C when your lighting strategy may change with crops, cultivars, seasons or production requirements.

Commercial glass greenhouse interior showing roof trusses, support structures and crop-growing areas.

Designed Around
Your Greenhouse.

View Lighting Engineering

Commercial Lighting
Engineering

Lighting Engineering

Project
Layout
Validation

Lighting Plans for Your Growing Needs

Tell us your crop and target light level. We can help select the right fixtures and plan the quantity and spacing for your greenhouse.

Greenhouse lighting simulation report showing fixture layout, calculated PPFD distribution and uniformity results.
Lighting Performance Validation

Choose the Control Level for Your Project

WR + IR CONTROL

HIGROWSIR TopSpread 2C commercial greenhouse LED toplight with WR and IR channel control.

TopSpread 2C

2 Channels

Combined white/red output with independent IR control.

View 2C

CURRENT MODEL · R + B + W

HIGROWSIR TopSpread 3C commercial greenhouse LED toplight with independent red, blue and white channels.

TopSpread 3C

3 Channels

Independent red, blue and white control for flexible spectrum adjustment.

TopSpread 3C

R + B + W + FR CONTROL

HIGROWSIR TopSpread 4C commercial greenhouse LED toplight with four-channel spectrum control.

 

TopSpread 4C

4 Channels

Adds independent far-red control for broader spectrum adjustment.

View 4C

For Commercial Greenhouse Projects

Need a lighting plan for your greenhouse?

Share your greenhouse dimensions, mounting height and target PPFD. We can review fixture selection, quantity and layout before quotation.

×

Contact Us

captcha
×

Inquiry

*Name
*Email
Company Name
Tel